PSK Green Energy

Bulinding Sustainable Energy Solution for Future

We manufacutre PATHOCIDAL a hypochlorous based mixed oxidising agent

Other Sectors We Serve

  • Solar System Design & Engineering
  • Solar Pv Power Plant Site Development
  • Solar System Component Sourcing
  • Solar System Installation
  • on-site Supervision
  • System Commissioning & Acceptance Facilitation
  • Solar Pv System Operation & Maintenance
  • Solar System Monitoring

2. Erection and commissioning of 18.75 MW x 2 (DC, MMS) in 230MW NTPC SPV Ettaiyapuram, Tuticorin Dt.
Contractor: Larsen and Toubro Ltd – Chennai
Client: NTPC

3. Casting, Erection and installation of Prestressed Boundary Wall – 5KM
Project: 230MW NTPC SPV Ettaiyapuram
Contractor: Larsen and Toubro Ltd – Chennai
Client: NTPC

4. Erection and commissioning of IDT, HT Panel and associated activites (AC) in 230MW NTPC SPV Ettaiyapuram, Tuticorin Dt.
Contractor: Larsen and Toubro Ltd – Chennai
Client: NTPC

5. Laying and construction of storm water drain inside solar PV power plant 230 MW NTPC SPV Ettaiyapuram, Tuticorin Dt.
Contractor: Larsen and Toubro Ltd – Chennai
Client: NTPC

Completed Projects

Project 1:

Client: Shriram EPC LTD
Activities performed: Complete Design, Land proposal, Cost estimation, identification of suppliers and tendering for 400MW NLC INDIA LIMITED Solar PV Power project in Tamilnadu

Project 2:

Client: Shriram EPC LTD
Activities performed: Preliminary Design, Cost estimation, pre tender documentation work for 100MW Solar PV Power project in Oman.

Project 3:

Client: Shriram EPC LTD
Activities performed: Consultancy work for prospecting and business development of solar PV power project in Vietnam.

Project 4:

Client: Ultra Green Corporation – USA
Activities: Complete Design, Land proposal, Cost estimation, identification of suppliers and tendering for 200MW (AC) solar PV Power Project Integrated with 660MWHr Battery Energy Storage System in Tamilnadu
Tender Ref No: Tender Search Code for ISN-ETS: SECI-2019-TN000012 RfS No. SECI/C&P/HPD/ISTS- VII/RIS/1200MW/082019 Dated: 01.08.2019

Project 5:

1KW Solar Power Pack Location: Mysore – Karnataka Year of completion-2010 Role: Design, Procurement, Erection

Project 6:

Main project features: To assess the economic viability of powering telecom towers by solar photovoltaic and identifying appropriate strategic measures for enhancing the use of solar technology in Indian telecom industry.
The feasibility studies completed are for following cases:
Implementation of solar as a replacement of diesel Generator,
Implementation of solar as a independent single source of energy

Project 7:

Client: NGO-Bangalore
Activities performed: After studying the detailed energy consumption, we have come up with 2.3KWp standalone solar PV system. Major activities include, design, engineering, procurement and
commissioning of the plant